
Add to Cart
16A 3 Phase Wall Box EV Charger Station
Each charger will be fully inspection to ensure product performance in good condition:
Withstand voltage insulation test - start high voltage machine test
Charging preparation -- measuring input voltage
Charging connection confirmation - measuring resistance
Ready to charge - measure current
Ready to charge - measuring frequency
Start up and charging stage - measure the output voltage
Start up and charging phase - measuring output current
Normal charge end test - measure output voltage
CP Disconnection Test: measure the output voltage after resuming charging
CP ground test - measure output voltage
Input overvoltage protection - measure output voltage
Input overvoltage protection - automatic recovery function, measuring output voltage
Input undervoltage protection - measure output voltage
Input undervoltage protection - automatic recovery function, measuring output voltage
Leakage protection - measuring output voltage
Overcurrent protection - measuring output current
Over current protection - automatic recovery function, measuring output current
EV Charging Power and Time | |||||
Charger | AC/DC | Rated Power | 30kWh Battery | 60kWh Battery | 90kWh Battery |
Schuko 16A | AC | 3.6kW | 8hrs | 16hrs | 24hrs |
Schuko 32A | AC | 7.2kWh | 4hrs | 8hrs | 12hrs |
1-phase 16A | AC | 3.6kW | 8hrs | 16hrs | 24hrs |
1-phase 32A | AC | 7.2kWh | 4hrs | 8hrs | 12hrs |
3-phase 16A | AC | 11kW | 3hrs | 6hrs | 9hrs |
3-phase 32A | AC | 22kW | 1.5hrs | 3hrs | 4.5hrs |
DC Fast charge | DC | 50kWh | 40mins | 80mins | 120mins |
Tesla Supercharger | DC | 120kW | 15mins | 30mins | 45mins |