
Add to Cart
10m Cable Chargepoint Home Charger 240 Volt Outlet For Electric Car
Feature
1. Have high voltage charging gun of European standard, American standard and Japanese standard. It can generate different charging configures according to customers’ requirements.
2. Modular design, adapt to customers’ needs.
3. OCPP communication protocol
Name | 240 Volt Outlet For Electric Car |
Socket Type | IEC 62196 |
Rated Voltage | 220-250V AC |
LED Status Indication | 14.1 ounces |
Certificate | CE TUV FCC |
Degree of Protection | IP65 |
Operating Temperature | -25°C ~ +50°C |
Cable length | 10 meters |
Start method | plug and charge |
Appearance
|
Rated power
|
Type 2: 7/22kw
Type 1: 9kw
|
Input Voltage
|
Single phase:230V±10%
Three phase:400V±10%
|
|
Output Current
|
Type 2:7kw-single phase 32A
22kw-three phase 32A
Type 1:9kw-single phase 40A
|
|
Functional Features
|
User Interface
|
Emergency Stop/LED indicator/RFID
|
Safety Features
|
Overvoltage/undervoltage protection, overload protection,
leakage protection, Overcurrent protection
|
|
Communication
|
Internet Interface
|
Ethernet(WIFI, 3g/4gLTE as optional)
|
OCPP
|
OCPP 1.6J
|
|
Working environment
|
Working latitude
|
<2000m
|
Working temperature
|
-30° C~+55° C
|
|
Working humidity
|
5 %~ 95%
|
|
Protection level
|
IP55
|
|
Cooling
|
Natural cooling
|
|
Safety standards
|
IEC61851-1/2017
|
|
Special protection
|
Anti-UV protection
|
Caution
1. Don't submerge the ev charging box in water;
2. Don't step on, fold or knot the cable;
3. Don't drop the EV charging box or place a heavy object on it;
4. Don't place the charging cable near high temperature object when charging;
5. Don't operate the EVSE in temperatures beyond its operating range of -25°C to 55°C;
6. Power-supply side input cable should be at least 3*6mm, with a standard 32A socket;
It is suggested that the power distribution is done by the professionals;
7. Don't put fingers into the charging connector when the power plug is still connecting to the
power;
Function
• Smart: The mobile phone APP provides functions such as search, navigation, query, and appointment of charging.
• Seflient: Support services such as swiping cards and mobile apps
• System: Advanced cloud fast charging platform system, providing big data monitoring
FAQ
Q: How long is your delivery time?
For charging posts, it is usually 3-10 days. If there is no stock, the production lead time is determined according to the order quantity. High-power DC char- ging posts usually need to be customized according to the customer's technical parameters.
Q: How long does it take to customize the prototype?
For charging piles, the prototype time is usually 7 days.
For DC charging post, the prototype time is usually 15 days.
For high power fast charging station, the technical parameters need to be
determined before production, and the prototype time is usually 30 days.
Q: How to guarantee the service?
Our products are divided into two categories: household and commercial.
For home chargers, we provide standardized service: 1 year warranty + remote installation and usage guidance + video installation tutorial
For commercial chargers, we not only provide standardized services for charging piles, but also provide payment software docking services for opera
ting companies.
Q: How do you guarantee the quality of your products?
The charging post products we sell have passed GB certification in China and CE certification in EU. For some other countries, the relevant certifications are
in progress.